
Front driveway prior to paving preparation.
Front driveway being prepared for paving.
Front parking lot has been graded for paving.
Front parking lots have been paved.
View of museum from southwest.
Some of the steel for the office has been delivered.
The south mezzanine is up and has been prepared for a concrete slab floor to be poured.
The north mezzanine inside [...]






